I'm still messing with getting electric to my pole building. As I mentioned in another thread, I got the conduit in the ground last Monday. It was a muddy mess but we got er done. It rained Tues and Weds. The inspector gave me the go ahead to cover the conduit, but the rain filled the trench with water.
I'm guessing by now some water has gotten into the conduit. I still have to run a string through the conduit (about 65 ft. ) so they can pull the wire through it. Now I don't know how I'll get that done.
Since it is a straight run with two sweeping L's at each end, I thought I might be able to force some 12 2 through the conduit. Is that likely to work?
Has anyone messed with this kind of stuff before?
I'm guessing by now some water has gotten into the conduit. I still have to run a string through the conduit (about 65 ft. ) so they can pull the wire through it. Now I don't know how I'll get that done.
Since it is a straight run with two sweeping L's at each end, I thought I might be able to force some 12 2 through the conduit. Is that likely to work?
Has anyone messed with this kind of stuff before?